Rapid Growth + Strategic Challenges = Call CC!

Posted by carlson on July 21, 2015 in Case Study, Tenant Rep

pine-bend (3)

In Q1 2015 the overflow of materials at the Flint Hills Resources Pine Bend refinery was a hindrance and liability: FHR needed to capitalize on business opportunities and maintain adequate safety stock.  More space was required, so FHR again turned to Eddie Rymer to source and secure additional space, all in a timely manner.

Leaning on the CC team, Eddie utilized our company’s knowledge of the market and our professional relationships led to a fast and cost effective solution.  In less than 120 days from project launch, FHR leased 88,000 sf.  The space allows for expansion and is located less than 1/4 mile from the Pine Bend refinery.